How To Work With Us

Obtain Your Tailored Plastic Molded Components in 8 Simple Steps

01.

Send Us Your Design

Feel free to submit any design from the following options.

3d drawing

3D or 2D part drawing

  • Prefered 3D format: X_T / STP /  IGS / SLDPRT
  • Prefered 2D format: DWG / DWF / PDF
Actual sample

Actual sample

Send us a physical sample or prototype. We’ll adjust the design accordingly.

Sketch or Draft

Sketch or Draft

We can provide a tooling price estimate for budgeting based on your rough sketch with approximate dimensions.

02.

Get Our Quote

Expect your customized molded parts quote within 12 hours.

Our quotation sheet

03.

Confirm Your Order

Payment terms: 40% or 50% payment upfront to get started.

REFUND GUARANTEE:

 We offer a 100% refund if you’re not satisfied after receiving our DFM report.

Purchaser Order picture

04.

We'll Analyze The Part For You

Optimize and analyze parts for injection molding with our DFM report, You don’t need to be a mould expert.

TIME REQUIRED: 5 ~ 10 DAYS OR MORE

05.

We Build The Mould

Concerned about tooling progress? We provide weekly updates.

TIME NEEDED: 3 WEEKS OR LONGER

06.

Sample Approval

Molded samples typically require three times or fewer sign-offs.

TIME REQUIRED: 1 – 3 WEEKS

T1 plastic injection molded sample

T1 Samples

Customers review part dimensions, color, basic finish, and assembly. An FAI report is available prior to or with shipment.

T2 plastic injection molding sample

T2 Samples

We make mold adjustments based on T1 feedback and ship new parts accordingly. This step may be skipped if T1 is approved.

T3 plastic injection molding sample

T3 Samples

We apply texture or polishing for final approval. Samples with secondary operations will also be processed during this time.

07.

Plastic Part Production

Ambition Industrial offers various injection molding production methods, including manual, automatic ejection, and robotic.

Time needed: 1 week or longer.

mould trial

08.

Custom Plastic Parts Delivery

We facilitate flexible delivery options, allowing customers to either arrange pick-up from our factory or have us arrange delivery for them.

BY EXPRESS: 6 – 8 DAYS

good packing for your plastic parts

How We Pack

We handle packing with care. Your plastic components will be securely placed for safe transportation in good condition.

marks for goods delivery

What To Mark

Each carton of plastic parts will be labeled with order details for traceability in case of any issues.

the deliver ways to send your products

How We Deliver

We ship via our shipping forwarder at a competitive cost or through your courier express account with carriers like UPS, DHL, FedEx, and more.

Let us provide a quote for your next project

Ask For A Free Quote